Building Regulations

Structural Engineering Calculations, Technical Drawings & Building Control Compliance

Technical Specs & Engineering

Structural Compliance & Building Control Sign-Off

Securing Building Regulations approval is essential to verify structural integrity, fire safety, thermal performance, and drainage compliance. V16 Designz produces complete technical drawing packages, structural calculations, and specification schedules required by Local Authority Building Control (LABC) and approved private inspectors.

100% LABC Pass

Full structural compliance across UK councils.

Chartered Engineers

Steel beam & foundation calculation packages.

Structural Engineering Specifications
Technical Engineering Calculations
Technical Portfolio

Recent Building Control Submission Packages

Kensington Structural Package LABC Approved
Kensington Basement Structural Pack

Underpinning calculations, steel beam frame design, and waterproofing specs approved.

Hampstead Steel Sizing Approved 2024
Hampstead Rear Extension Steel Sizing

Double-ridge steel beam calculations, padstone details, and Part L thermal insulation schedule.

Chelsea Commercial Fire Pack Approved 2025
Chelsea Fire Strategy & Thermal Pack

Part B fire escape strategy, fire-rated wall specs, and SAP energy compliance calculation.

Engineering Scope

Our Building Regulations Spectrum

Steel Beam Sizing
Structural Steel Sizing

RSJ steel beam calculations, goalpost frames, and padstone specs.

Foundation Engineering
Foundation & Concrete

Strip footings, raft foundations, and clay soil tree proximity engineering.

Thermal & Fire Safety
Fire & Thermal Compliance

Part B fire safety, escape routes, and Part L SAP thermal insulation calculations.

Drainage & Water Consent
Drainage & Build Over

Thames Water build-over agreements and Part H foul/surface water layouts.

Approval Journey

Our 3-Step Technical Approval Process

Structural Investigation
STEP 01
Structural Audit & Calculations

Conducting load-bearing analysis, soil checks, and engineer beam calculations.

Working Drawings
STEP 02
Technical Working Pack

Drafting 1:50 construction drawings, structural connections, and specification notes.

Building Control Inspection
STEP 03
Building Control Sign-Off

Submitting to LABC / Approved Inspector and coordinating site engineer inspections.

Need Full Building Control Approval?

Ensure your construction project meets all UK structural, fire, and thermal regulations with our chartered engineering team.

Request Technical Quote